From: route@monster.com
Sent: Thursday, April 07, 2016 11:49 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
John T. Welch 46625 Rockhill Rd. Bay Minette, Al. 36507 (251) 580-0550 John.welchp6@yahoo.com OBJECTIVE:
I seek a responsible/challenging position in Project
Controls/Estimating/Planning-Scheduling. SUMMARY
OF EXPERIENCE: Over 30 years in the
Industrial/Commercial/Marine, Oil & Gas,and Nuclear Electrical
fields, supervising, estimating, budgeting, scheduling, planning, cost
engineering,EVMS,productivity/efficiency reports. Customer liaison, design,
field engineering, installation, testing and commissioning of a wide variety
of electrical/technical systems. COMPUTER
SKILLS: Microsoft Windows 2000,
Office (Word 6.0, Excel, PowerPoint, etc.) Works, Microsoft Projects, AS400
(Elite), Primavera P3/P3e/P5/P6 &P6.1, AutoCAD LT2000/Rel. 14, Cabsys,
Oracle, IBM Eicon “Aviva”, MS T-SQL EDUCATION: 6/69 - 5/73Various Avionics/ElectronicsAvionics USMC 9/73 - 5/75Faulkner StateEngineering Bay Minette, Al. 9/75 - 5/76University of South AlabamaElect.
Engr’g Mobile, Al. 12/83 - 5/84College of the MainlandFinance/Business Texas City, TX. 3/93 - 9/93TPC Training SystemsIndustrial
Maintenance Southern Aluminum, Bay Minette, Al. 6/93 – 7/93Bannerman Project ManagementProject
Mgmt. Atlantic Marine, Mobile, Al. 3/97
– 4/97 University of
South AlabamaManagement
&
Mobile, Al. Leadership 6/95 – 1/98Bishop State CollegeMarine Engr’g Mobile, Al. 2002Evans
TechnologyPrimavera P3/P3e Atlanta, GA 2001AlaCADAutoCAD Mobile, Al. 2003Bender
ShipbuildingMS T/SQL Mobile, Al. 2009CDI Univ/PMIPMP Cert (In Progress). EMPLOYMENT
HISTORY Feb.14 -
PresentTurner Industries Group, L.L.C. Baton Rouge,
LA.
T/A
Planner/Scheduler Turner
Industries Group, L.L.C. Baton Rouge, LA. Using P6, Planned/Estimated/Developed Turnaround Schedules for
various Chemical Plants and Refineries. Resource management of Various
Maintenance/Repair/Engineers/Designers/Construction schedules to develope
Integrated Master Interface Schedules.. Duties include
Estimating/Planning/development of WBS, System Scope/Integration to facilitate
major milestones. CPMAnalysis including delay, recovery plans within
Project constraints for all . Develope S-Curves, Graphs, charts, Power
Point Presentations etc., to facilitate EVMS and Reporting.
Jun.11 -
Feb. 14AxonEPHouston, TX
Project
Controls Planner/Scheduler AxonEP (Energy Products)Houston, TX. Using MS Project (and wishing I had P6), Planned/Estimated/Developed
EPC Schedule for new Rig Concept,Design & Build. Resource management of
Engineers/Designers/Construction schedules to develope Integrated
Master Interface with Engineering, Design, Procurement and
Construction.. Duties include Estimating/Planning/development of WBS,
System Scope/Integration to facilitate major milestones. CPMAnalysis
including delay, recovery plans within Project constraints for all .
Develope S-Curves, Graphs, charts, Power Point Presentations etc., to
facilitate EVMS and Reporting.
Aug.10 –
Jun.11GE EnergySalem, VA.
Senior
Scheduler, NPI Project (FootbridgeContractor) GE,
Salem, VA. Using P6 and MS Project, Planned/Estimated/Developed Scope/maintained
Master Schedule(s), Resource management of Engineers/Designers/Construction
schedules to develope Integrated Master Interface with Engineering,
Design, and Craft for “buy-in” and customer approval. Duties
include Estimating/Planning/development of WBS, System Scope/Integration to
facilitate major milestones. Analysis including delay, recovery plans
within Project constraints for all . Develope S-Curves, Graphs, charts, Power
Point Presentations etc.,
Sept. 08 –
Aug.10CDI MarineNGSS, P’goula, MS.
Project
Lead Senior Scheduler, Systems Integration (CDI Marine Contractor) Northrop
Grumman Corporation, Pascagoula, MS Using P6
and MS Project, Planned/Estimated/Developed Scope/maintained Master
Schedule(s), integration of all system schedules to develope Vessel Class
Master. Interface with Engineering, Design, and Craft for “buy-in” and
customer (USN) approval. Duties include Estimating/Planning/development
of WBS, System Scope/Integration to facilitate major production milestones.
Analysis including delay, recovery plans within Project constraints for all
LPD/DD(X) Class Ships. Migration of Project Schedules from MS Projects to
Primavera P6.
Apr.08-Sept.08
Parsons EngineeringTKS, Mobile, Al.
Project
Senior Scheduler, (Sirius Technical Systems Contractor) ThyssenKrupp
Steel Mill, Calvert, Al. Using P6 and MS
Project, Planned/Estimated/Developed Scope/maintained Master Schedule(s),
integration of Contractor schedules and Sub-Contractor(s). Performed
cost-projections/recovery plans on critical areas of
construction. Duties include Estimating/Planning/development of
WBS, project progression analysis including delay, recovery and
resource allocation, data synchronization and verification between
Project/Site Managers and ThyssenKrupp Management. Oct.07 –
Apr.08Parsons EngineeringNGSS Pascagoula, MS.
Project
Senior Scheduler, (Sirius Technical Systems Contractor) Facilities
Modernization Program/Disaster Recovery (Katrina) Using P6 and MS
Project, Developed/maintained Master Schedule(s), integration of Contractor
schedules and Sub-Contractor(s). Performed cost-projections/recovery
plans on critical areas of construction. Duties include
development of WBS, schedule cost and resource loading, project progression
analysis including delay, recovery and resource allocation, data
synchronization and verification between Project/Site Managers and Northropp-Grummann
Management. Jan.07 –
Oct.07 Southern
Company(GPC), Plant Crist, Pensacola, FL.
Project
Master Scheduler, (CB&A Contractor) FGD/SCR
Projects Using P3.1,
Developed/maintained Master Schedule, integration of EPC schedules from
Engineering /Procurement and Sub-Contractor(s). Performed
cost-projections/recovery plans on critical areas of
construction. Duties include development of WBS, schedule cost
and resource loading, project progression analysis including delay, recovery
and resource allocation, data synchronization verification between
Project/Site Managers and SCG Management. Oct.06
–Dec. 06 Chevron
Refinery Pascagoula, MS.
Maintenance/Repair/Shutdown
Scheduler, (Sirius Technical Systems Contractor) Scheduling using
Primavera P3e, Planned Maint/Repairs of Refinery Machinery, Equipment and
Systems.. Duties include development of schedule and resource
loading, project progression analysis including delay, recovery and resource
allocation, coordination with Plant Operations and various departments
in establishing critical activities. Oct.05 –
Oct.06 Brown’s
Ferry Nuclear Plant Decatur, AL.
Project
Cost Engineer/Scheduler, (Sun Technical Systems Contractor) Design and
implementation of project cost controls, analysis and
cost-projections/recovery plans on critical areas of
construction. Duties include development of WBS, schedule cost
and resource loading, project progression analysis including delay, recovery
and resource allocation, earned value management, data synchronization
verification between Project Managers and COBRA. May 04 –
Oct. 05 Corps of Engineers,
MOBILE DISTRICTMobile, AL.
P2
Project Controls Consultant (B.I.T.S. Contractor) Apply top-level project
controls knowledge to schedule development, integration, and implementation
as well as high-level analysis in the P2 System. Additional duties include
development of WBS, schedule cost and resource loading, project progression
analysis including delay, recovery and resource allocation, earned value
management, data synchronization verification between Project Managers and
CEFMS, provide knowledge transfer, as needed, to designated district
personnel in the use of P2/Primavera P3e. Maintain schedules on a monthly
basis. Jan. 01 – Dec. 03Bender Shipbuilding Mobile, AL.
CPC
Production Control Planner/Electrical Design Engineer Supervised Planning
Team in establishing scope of work based on specifications and prints,
detailing job plans/schedules with estimates, performance reports, and other
multitudinous tasks for all Marine crafts and subcontractors on various
commercial/Military projects. Interacting with individual Superintendents and
Foremen in reviewing job requirements, job scope and labor requirements.
Field Engineering solutions to various problems and interference’s of
different crafts and electrical equipment/devices. Reviewing drawings before
release to production to incorporate any/all changes into planning and
scheduling. Budgeting /scheduling/planning /job-cost projections
etc., for all crafts on various repair jobs. Electrical/Electronic Design
engineering with particular emphasis on Offshore Supply Vessel (OSV’s).
Writing purchase specifications for equipment and systems per design/class
and regulatory bodies. Sept. 00 – Jan 01Friede-Goldman Offshore Pascagoula, MS. Cabsys
Administrator Electrical Design Group
Leader consisting of 8 AutoCad Designers, 6 Cabsys Engineers and 2 file/data
entry personnel. Cabsys is an Oracle based cable/wireway design, engineering
tool and database. Designing and engineering wireways, size/type of cables, transits,
penetrations, fill etc., of 2 Bingo Drill Rigs, 2 Amethyst Semi-submersible
drill rigs. Interfacing with various disciplines in Engineering, Management
and Craft in installing over 2 million feet of cable, 11,500 plus cables,
9000 plus pieces of equipment and over 115,000 conductor terminations for
each rig. June 00 – Sept. 00Bender Shipbuilding Mobile, AL. CPC
Electrical Planner/Engineer Established scope of
work based on specifications and prints, detailed job plans with estimates,
performed performance reports, scheduled multitudinous tasks for all
electrical crews and subcontractors on the LCPL Roy M. Wheat, MSC Conversion
project.
Interacting with individual Superintendents and Foremen in reviewing job
requirements and scope of work. Field Engineering solutions to various
problems and interference’s of different crafts and electrical
equipment/devices. Reviewing drawings prior to release to production to
incorporate any/all changes into planning and scheduling.
Feb 98 – June 00Friede-Goldman Offshore Pascagoula, MS. Electrical
Supt. Supervised/Managed
electrical department, from construction of brand new facilities to complete
outfitting of all electrical equipment and systems aboard the Bingo 9000
state of the art Jan. 94 – Feb. 98Alabama Shipyards Mobile, Al. Senior
Leaderman, Elect. Dept. Supervising Marine
Electrical crews, Field Engineering of Power & Lighting systems,
Estimating, Design, Planning and Scheduling. Assist Maintenance Dept. in
troubleshooting and repair of all yard power distribution for
Sub-Stations-down. Aug. 92 – Jan.
94
Southern Aluminum
Bay Minette, Al.
Electrical Maintenance Tech. Troubleshooting, repair and maintenance of all plant
equipment and PLC controlled equipment. Nov. 89 – Aug.
92
Atlantic
Marine
Mobile,
Al.
Leaderman, Elect. Dept. Supervised Marine
Electrical crews, troubleshooting and repair of all Marine equipment and
systems, Estimating, etc., Performed all repair and maintenance on Yard
Electrical Distribution And cranes. Aug. 88 – Nov.
89
Baltz Brothers
Nashville,
TN.
Maintenance Supv. Troubleshooting, repair
and maintenance of all plant equipment from sub-zero warehouses to 250 deg.
Plus smokehouses, manufacturing 57 different brands of lunchmeats. Feb. 82 – Nov.
88
EMSCOR
Houston, TX.
2/82-11/88 Service Mgr./Tech.
Rep. *Supervised installations and tests of various types
of cranes & elevators. Dec. 79 – Feb.
82
Alabama
Maritime
Mobile,
Al.
Electrical Foreman,
New Construction Supervising Marine
Electrical crews, Field Engineering of Power & Lighting systems,
Estimating, Design, Planning and Scheduling. Sept. 77 – Dec.
79
Den-tal-eze
Bay Minette, Al.
Maintenance Supv. Troubleshooting, repair
and maintenance of all plant equipment and systems. Created and setup
companies first Work-Order System and PM Programs. May 75 – Sept. 77
Industrial Systems
Mobile, Al.
Maintenance
Planner/Scheduler Performed all planning
and scheduling for 24 man Maintenance Dept., coordinated with different
departments to minimize any production conflicts and Research/Development to
improve production systems. REFERENCES Donna Adame AxonEP President donnaadame@axonep.com Phone:
281-656-3246 Mobile:
281-704-0169 Guy Fortenberry Commissioning
Manager AxonEP guyfortenberry@axonep.com 832-683-8644 Eric Jenkins HSE Manager AxonEP ericjenkins@axonep.com 832-492-4599 Joe Piccolo Robert D. Dillon 2485 Notre Dame Blvd Suite
#370-46 Chico,
CA. 95928 Cell
(714) 469-6293 robert_d_dillon@yahoo.com James
Cavin (GE Energy) Senior Engineer/Technologist Email: james.cavin@ge.com Phone: 540-278-8158 Joy
Mathew (GE Power & Water) Senior Project Manager Email: joy.mathew@ge.com Phone: 540-235-9374 Cell: 518-487-0491 James
Defalco (GE Energy) Lead Engineer/Technologist Email: james.defalso@ge.com Phone: 540-278-5788 Hans
Christeler (GE Power & Water) Senior Technical Manager Email: hans.christeler@ge.com Phone: 540-235-4539 Cell: 518-859-0341 Charles
Hyland Sr. 5301
Isabel Way So. Mobile,
Al. 36695 Hyland,
Charlie (US SSA) Phone.
251-209-7965 Tina
Loder 10365 Strickland Road Grand Bay, AL 36541 Phone: (251)865-6723 HM (251)377-7022 Cell e-mail- tinaloder@earthlink.net Edward C. Wagner 9040 Morphy Ave. Fairhope, Alabama 36532 Cell Phone: 251-533-2630 House : 251-517-4611 Work : 228-934-7633 E-Mail; edwardcwagner@aol.com Michael R. Landon 7811 Landing Eagle Drive Daphne, AL 36526 954-654-4017 Daniel Saucier 1950 W. Rachael Dr. Mobile ,Al. 36695 251.656.3621 Ken
Randall Senior Instrument Desgner M.W.Kellogg Limited Kellogg Tower Greenford Rd. Greenford, UB6 OJA, UK Office Phone: +44 (0)208 872 7943 Email: ken.randall@mwkl.co.uk Registered Office: as above Registered in England and Wales No. 909986 Guy M. Cagnolatti,
CPIM PARSONS Project Control Manager 702 Watts Avenue Pascagoula, MS 39567 Office (228) 202-5020 Cell
(228) 327-0777 FAX
(228) 202-5001 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
|